Charging for electric vehicles in car parks and depots, from the charge point to the switchboard that feeds it.

We design, supply, install, test and commission the charging of electric vehicles in car parks, depots and forecourts, and maintain the systems we installed: AC charge points for the bays where cars stay for hours, DC chargers for the bays where they must charge quickly, the load management that shares the building's capacity between them, and the distribution boards, cables and protection that supply them.

The design starts from the vehicles and how long they stay: the bays to equip now and those to prepare for later, the energy each vehicle needs and the hours it has to take it. From these we work out the demand the charging adds to the building, the capacity its transformers and switchboards can spare, and the load management that keeps the charging within that capacity, and we design the supply and its protection to IEC 60364-7-722 and the charging equipment to IEC 61851.

We supply the charge points, the DC chargers and their distribution from the brands we carry, and our teams install, connect and commission them. Each circuit is tested for its insulation, its earth fault loop impedance and the operation of its residual current device, and each charger by charging a vehicle or a test load, before the charge points are registered with the operator and, where it asks for it, with the authority. Under a service contract we then maintain the systems we installed: chargers inspected, cables and connectors checked for wear, protection tested.

AC and DC charging

AC charging in mode 3 of IEC 61851-1 suits the bays where vehicles stay: wall-mounted or pedestal charge points with Type 2 sockets or tethered cables to IEC 62196-2, at 7.4 kW single-phase or 11 and 22 kW three-phase, the vehicle's own charger setting what it actually takes. DC charging in mode 4 suits the bays where a vehicle must charge in under an hour: chargers of 50 to 150 kW or more to IEC 61851-23, with CCS2 connectors to IEC 62196-3 and, where a fleet needs it, CHAdeMO.

We place the chargers for the way the car park is used, with the bollards and wheel stops that protect them and the bays laid out so that no cable crosses the walkway. Each charge point connects over OCPP to the back office the operator chooses, for access by card or app, billing and monitoring, and supports ISO 15118 where the vehicles and the operator use plug and charge. In covered car parks we coordinate the chargers with the ventilation, the sprinklers and the fire alarm.

Supply, load management and protection

Charging adds a large demand to a building, so we design its supply around load management. A local controller measures the building's load at the main switchboard and shares the spare capacity between the charge points, lowering each one's current when the building needs its power and raising it again at night, so that more bays can be equipped than the transformer could feed at full power at once. Where the capacity is not there, we size a new transformer or feed the chargers from their own supply.

Each charge point has its own final circuit, protected under IEC 60364-7-722 by its own overcurrent device and a residual current device of 30 mA, either Type B, or Type A with detection of DC fault currents of 6 mA, in the charge point or in the distribution board. We earth the charge points to suit the supply, so that a broken PEN conductor in a TN-C-S supply cannot raise a vehicle's body to a dangerous voltage, and protect the circuits that leave the building against surges.

Systems and equipment

AC charging

  • Wall-mounted charge points: 7.4 to 22 kW, with a Type 2 socket or a tethered cable
  • Pedestal charge points: single or twin outlets for open car parks and kerbsides
  • Home and fleet chargers: for villas, residential buildings and depots, with their own metering

DC charging

  • DC fast chargers: 50 to 150 kW, with CCS2 and CHAdeMO connectors
  • High-power chargers: above 150 kW, with power cabinets and dispensers for depots and forecourts
  • Cable management: retractors and holders that keep the heavy DC cables off the ground

Supply and load management

  • Load management controllers: the building's spare capacity shared between the charge points
  • Distribution boards: a final circuit for each charge point, with its residual current and overcurrent protection
  • Transformers and feeders: for car parks and depots whose demand the building cannot carry
  • Metering: the energy of each charge point measured for billing and for the building's records

Software and integration

  • OCPP connection: to the operator's back office for access, billing and monitoring
  • Access: RFID cards, apps, and plug and charge to ISO 15118
  • Building management interface: charging power and faults passed on to the building management system

Standards we work to

  • IEC 61851-1: electric vehicle conductive charging systems, the general requirements
  • IEC 61851-23: DC electric vehicle supply equipment
  • IEC 62196-2: plugs, socket-outlets and vehicle connectors for AC charging, Type 2 among them
  • IEC 62196-3: vehicle couplers for DC charging
  • IEC 60364-7-722: supplies for electric vehicles
  • ISO 15118: the communication between the vehicle and the charger
  • OCPP: the Open Charge Point Protocol
  • The regulations of the UAE's electricity authorities, those of DEWA in Dubai among them