Commercial

Offices, towers and warehouses, with the cooling, power and life safety systems of a working building.

The building services of offices and warehouses

An office building is let on the quality of its services: air that keeps a full floor fresh and cool through a Gulf summer, power and data at every desk, lifts that carry the morning's arrivals without a long wait, and life safety systems that bring everyone down a tall building in a fire. Its floors change tenants and layouts many times over its life, and each tenant pays for the energy it uses, so the services must take each new fit-out and measure what each floor uses. A warehouse asks for the opposite kind of building: one tall volume with its doors open to the yard, where the services hold the goods at their temperature, keep the air breathable where the trucks run and hold a fire in the racking until the brigade arrives.

We plan a tower's services with its architects and its developer from the floor plate and the height, which decide the cores, the risers and the plant floors, and from the tenants it is built for. The base building's systems are designed so that a tenant's fit-out connects to them on every floor, and where the client wants it, our architects design the fit-out too. A tower is designed to the UAE Fire and Life Safety Code of Practice and its authority's green building regulations, with ASHRAE 90.1 for its energy and the IEC, EN, NFPA and CIBSE standards of each system.

We supply the plant and equipment of each system we build, and our teams install it on site. Each system is proved before the tenants move in: the air systems balanced to their design flows, the sprinkler systems hydrostatically tested, the phased evacuation tried floor by floor with the voice alarm and the smoke control, every copper link and fibre tested, and, where the client wants it, the lifts' tests witnessed with the lift contractor; the civil defence then witnesses the fire systems. Under a service contract we maintain the systems we installed. Each of these systems is described under Disciplines.

Cooling and air quality

A tower's chilled water comes from a district cooling network or from its own plant, and either way it must return warm. A tower on district cooling meets the provider's return temperature at its energy transfer station only if every coil above it does its part, so each coil has a two-port control valve, pressure independent where the circuits are long. Where the tower has air-cooled chillers of its own, they are selected for an entering air above the 46 °C of the design day. The office floors are served by variable air volume or by fan coil units, held at commonly 23 to 24 °C and 50 to 55 per cent relative humidity, and quiet enough for the noise rating of an open office, commonly NR 35 to 40. Dedicated outdoor air units cool and dry the fresh air, rotary wheels recover the cooling of the exhaust air, commonly at 70 per cent effectiveness or more, and carbon dioxide sensors set the outdoor air of the meeting rooms to the people in them.

Tenant power and metering

Each tenant takes its floor with its power waiting at the core and a meter on what it uses. The power rises in busbar trunking to IEC 61439-6, and a tap-off unit on each floor feeds the tenant's distribution board, from which the fit-out runs its circuits under the raised floor or in the ceiling, with 30 mA residual current devices on the socket outlets. Selectivity between the breakers is checked, so that a fault on a final circuit trips only its own breaker and no tenant loses its floor to a neighbour's fault. Each tenant's electricity and chilled water are metered and read by an energy monitoring system that shows the energy use, the peak demand and the power quality of each, so that what each takes can be billed and seen. In the basement car park, charge points on final circuits of their own share the building's spare capacity through load management, and are coordinated with the ventilation, the sprinklers and the fire alarm.

Life safety and smoke control

A tall building is not emptied at once down its stairs: its fire strategy evacuates it in phases, beginning with the floors nearest the fire, and the voice alarm gives each floor its message, alert or evacuate, in Arabic and English. The stairs and their lobbies are pressurised to keep the smoke out, and where the fire strategy calls for it, smoke extract fans rated to EN 12101-3 clear the floor of the fire. Under NFPA 13 an office is a light hazard occupancy, sprinklered at a design density of 4.1 mm/min over 139 m². Standpipes in the stairs give the fire service a residual pressure of 6.9 bar at the most remote outlet under NFPA 14, with 1,893 L/min for the first standpipe and 946 L/min for each one after it, up to 3,785 L/min in a building sprinklered throughout. Firefighters lifts to EN 81-72 reach the furthest floor from the fire service access level within 60 s, and every other lift returns to its designated floor on the fire alarm, to EN 81-73.

Lifts and vertical transportation

In an office tower the lifts are sized for the morning's arrivals, or for the lunchtime peak where that is heavier. We calculate to CIBSE Guide D the share of the building's population the lifts carry in its busiest 5 minutes and the interval or the waiting time, by calculation or by simulation, and divide a tall building into zones, each served by a group of its own. Destination control assigns each passenger a car by the floor entered before boarding and, linked to the access control, takes each card holder only to the floors it may reach. The car sizes follow ISO 4190-1 and the public lifts EN 81-70; most groups are traction lifts without a machine room, and the heaviest and fastest have their machines in a room above the shaft. We specify them to EN 81-20 and EN 81-50, with their energy performance to ISO 25745, for the lift contractor who supplies, installs and maintains them, and coordinate their shafts, pits and supplies with the structure and the electrical design.

Security and networks

A tower's lobby is open to visitors, and its floors only to their tenants. Speed gates in the lobby read the cards of staff, a visitor registered at reception is given a pass for the floor of the visit, and readers at the destination control terminals and at the tenants' doors take the same encrypted credentials, with a PIN or a biometric where a room needs two factors. We grade each door under IEC 60839-11-1, grade 1 for an office floor, and the intruder alarms under EN 50131, commonly grade 2 for offices. The base building's backbone is single-mode OS2 fibre from the building distributor to each floor's equipment room, with Category 6A from there to the outlets of the landlord's systems, and its two core switches are linked to each other, with every floor connected to both, so that the loss of one cuts off no floor. The landlord's cameras, access control and building management run on networks of their own, apart from the tenants'.

Energy efficiency

In the Gulf cooling is an office's largest load, and most of its hours are spent at part load. We light the desks to 500 lux, with a unified glare rating of 19 or less, under EN 12464-1, from LED luminaires on DALI that presence and daylight sensors dim or switch, so that a floor near the glazing or empty after hours draws little. The chilled water pumps and the fans run on variable speed drives, since a fan or a pump at 80 per cent of its speed draws about half of its full-speed power, and where the tower has its own plant, its chillers and pumps, and its cooling towers where it has them, are run together at their lowest combined energy, the chillers selected for their efficiency at part load. The building management system is designed to the efficiency class of EN ISO 52120-1 agreed with the client, and its trend logs show the plant holding its set points, so that a system drifting from its schedule is found.

Storage halls

A warehouse is one tall volume with its doors open to the yard, and its services are sized for the goods and the vehicles in it rather than for people at desks. Where the goods need a temperature, the hall is cooled or chilled as a whole, its roof and walls insulated, its dock doors sealed and fitted with fast doors and air curtains so that the loading bays do not lose the cold; a dry store in the Gulf is still ventilated and shaded, so that the stock does not bake under the roof. The forklifts and the charging of their batteries take ventilation and power of their own, and a cold store has its evaporators defrosted and its floor heated against frost. The racking decides the fire protection: in-rack or early suppression sprinklers under NFPA 13 where the storage stands over 7.6 m, hydrants and hose reels around the hall, and smoke vents in the roof that clear the aisles for the brigade. High-bay LED luminaires are laid along the aisles, lit by sensors only while a truck is in them, and the yard is lit and watched by cameras at the docks and the gates.

What we hold to in offices and warehouses

Every floor waits for its tenant: power, chilled water and the life safety connections are ready at the core for the fit-out to join.

A tall building is emptied in order: its floors leave in the phases of the fire strategy, down stairs kept clear of smoke.

What each tenant uses, it can see: the electricity and the chilled water of every floor are metered and reported.

A warehouse keeps its goods: cold where they need it, dry everywhere, and its racking protected from the first flame.

Systems and equipment

Chilled water and air

  • Energy transfer stations: for towers on a district cooling network, to the provider's requirements
  • Chillers: sized so that the peak load is met with one chiller out of service
  • Air handling units: variable air volume for the office floors, with heat recovery wheels
  • Fan coil units: two-pipe or four-pipe, on chilled water
  • Control valves: two-port, pressure independent on long circuits, so that the return stays warm

Distribution and metering

  • Busbar risers: to IEC 61439-6, with a tap-off unit on each floor
  • Tenant distribution boards: on each floor, with 30 mA residual current devices on the socket outlets
  • Energy meters: on each tenant's electricity and chilled water, read by the energy monitoring system
  • EV charging: charge points on final circuits of their own, under load management

Fire safety systems

  • Voice alarm: alert and evacuate messages floor by floor, in Arabic and English
  • Stair and lobby pressurisation: fans and relief dampers that keep smoke out of the escape routes
  • Sprinklers: 4.1 mm/min over 139 m² on the office floors, a light hazard under NFPA 13
  • Standpipes and landing valves: a residual 6.9 bar at the most remote outlet under NFPA 14
  • Firefighters lifts: to EN 81-72, in protected shafts

Lifts

  • Lift groups: sized by traffic analysis to CIBSE Guide D
  • Destination control: passengers assigned to cars by their floor before they board
  • Traction lifts without a machine room: the machine in the head of the shaft
  • Accessible lifts: cars to EN 81-70 for wheelchair users and their companions

Access and networks

  • Speed gates: in the lobby, reading the cards of staff and visitors
  • Lift access: readers at the destination control terminals, so that each card reaches only its floors
  • Intruder alarms: commonly grade 2 for offices under EN 50131
  • Optical fibre backbone: single-mode OS2 from the building distributor to every floor
  • Core switches: two, linked to each other, with every floor connected to both

Storage halls

  • Hall cooling and chilling: packaged units or chilled water, the hall held at the temperature of its goods
  • Dock seals and fast doors: with air curtains, so that the loading bays do not lose the cold
  • Rack storage sprinklers: in-rack or early suppression heads under NFPA 13, for storage over 7.6 m
  • Smoke vents: in the roof, clearing the aisles for the brigade
  • High-bay lighting: LED luminaires along the aisles, lit while a truck is in them