Skip to the content
Grey pipes with bends and clips running along a wall

Plumbing

Cold and hot water, drainage and sanitary systems, with the Legionella control a hospital needs.

We design, supply, install, test and commission the plumbing of buildings, and maintain the systems we installed: water storage and booster sets, the cold water, hot water and circulation systems with their calorifiers and heaters, the sanitary fittings, and the drainage above and below ground that takes the soil, waste and rainwater away. In hospitals we add the water safety measures that keep Legionella and Pseudomonas out of the outlets patients use, and treat the waste of laboratories and kitchens before it joins the sewer.

The design starts from the fixtures and the people of the building. We calculate the design flows from the loading units of EN 806-3 or the fixture units of the plumbing code the project follows, size the storage for the hours of supply the authority or the client requires, and lay out the systems so that the water in no pipe stands for long or reaches the temperatures at which bacteria grow. The drainage is sized to EN 12056 or to the plumbing code, with the ventilation that keeps every trap sealed.

We supply the pumps, the pipes and fittings, the calorifiers and the valves, those of the brands we carry among them, and our teams install and connect them on site. Each system is pressure tested, the water systems flushed, disinfected and sampled before they are taken into use, and the drainage tested for tightness and by flow. Under a service contract we then maintain the systems we installed: the temperatures at the sentinel outlets checked each month, little-used outlets flushed, thermostatic mixing valves serviced and the booster sets inspected.

Hot and cold water and Legionella control

Legionella multiplies in water between 20 and 45 °C, so the systems we design keep the cold water cold and the hot water hot. Under HTM 04-01 and HSG274 the calorifiers store at 60 °C or more, every hot outlet reaches 55 °C within 1 minute of opening in a healthcare building, and every cold outlet falls below 20 °C within 2 minutes. In the Gulf the cold water warms in its tanks and pipes, so we shade and insulate the tanks, keep the cold pipes away from heat, and chill it where the climate would warm it past 20 °C.

Thermostatic mixing valves of the healthcare type limit the water at basins and showers to 41 °C where patients could be scalded, fitted at the outlet so that only a short pipe carries blended water. We avoid dead legs, balance the circulation so that every branch stays hot, and where the water must be disinfected beyond its temperature we add copper and silver ionisation or chlorine dioxide dosing, with point-of-use filters on the outlets of high-risk units.

Drainage and pipework

Above ground we design the soil and waste systems to EN 12056-2 or the plumbing code, with ventilated stacks, branches laid to fall, access for rodding at every change of direction, and acoustic pipework where the stacks pass bedrooms and wards. Below ground the drains run through manholes to the sewer or the site's treatment plant; kitchen waste passes through grease separators, and laboratory waste through a neutralising tank before it joins the rest.

Rainwater from roofs and podiums runs to gravity outlets and downpipes sized to EN 12056-3 for the rainfall intensity of the site; the siphonic drainage of large roofs has a page of its own. The water pipework is PP-R to ISO 15874 or copper, stainless steel where the water's quality requires it, joined by fusion welding or press fittings, and every pipe is labelled with its service and insulated against heat gain or loss.

Systems and equipment

Water supply and storage

  • Water storage tanks: sectional GRP or stainless steel tanks in two compartments, shaded and insulated
  • Booster sets: variable speed multi-pump sets with their pressure vessels
  • Pressure reducing valves: holding each zone's pressure within the range of its fittings
  • Backflow prevention: check valves and reduced pressure zone valves chosen by the fluid category of EN 1717

Hot water

  • Calorifiers and water heaters: storage at 60 °C or more, heated by the boilers, heat pumps or electrically
  • Circulation pumps: keeping every branch of the hot water system hot
  • Thermostatic mixing valves: at the outlets where patients or children could be scalded
  • Disinfection for Legionella control: copper and silver ionisation, chlorine dioxide and point-of-use filters

Drainage

  • Soil and waste systems: PVC-U, PP or HDPE stacks and branches with their ventilation
  • Acoustic drainage: low-noise pipework where stacks pass bedrooms and wards
  • Gravity rainwater: roof outlets, downpipes and podium drainage
  • Lifting stations: submersible pumps in duty and standby pairs with their level controls
  • Grease separators and neutralising tanks: for kitchen and laboratory waste

Sanitary fittings

  • Fixtures: basins, WCs, showers and urinals, with sensor or lever taps in clinical areas
  • Clinical wash hand basins: without plug or overflow, the tap's flow not falling straight into the waste
  • Sluice rooms: bedpan washer-disinfectors and macerators

Standards we work to

  • EN 806: specifications for installations inside buildings conveying water for human consumption
  • EN 12056: gravity drainage systems inside buildings
  • EN 1717: protection against pollution of potable water in water installations
  • HTM 04-01: safe water in healthcare premises
  • ASHRAE 188: Legionellosis, risk management for building water systems
  • ISO 15874: plastics piping systems for hot and cold water installations, polypropylene
  • IPC and UPC: the International Plumbing Code and the Uniform Plumbing Code
  • The regulations of the UAE's water authorities, those of DEWA in Dubai among them